Experience

Water Technologies Systems Inc. – – Barbados Water Authority:
Desalination Monitoring & Test Well Project (South Coast of Barbados)
June – September 2017 – January 2018

Project management, design input and supervision of the installation of two (2) abstraction test wells approx. 220 feet deep, and two (2) monitoring wells 220-feet deep at the above site, including pump testing and water quality testing of water production and discharge capacity, as an input into extended well field design.

Everclear Water Inc. – Barbados Water Authority:
Desalination Monitoring & Test Well Project (North Coast of Barbados)
June – September 2017 – February 2018

Project management, design input and supervision of the installation of two (2) abstraction test wells approx. 200 feet deep, and two (2) monitoring wells 200-feet deep at the above site, including pump testing and water quality testing of water production and discharge capacity, as an input into extended well field design.

COMPLANT China National Complete Plant Import & Export Corp Ltd. – Wyndam Sam Lords Hotel Redevelopment Project – Geotechnical Investigations
– January 2017 – March 2018

Geotechnical investigation which required drilling over forty (40) borings drilled within the proposed building limits, to determine the in-situ strength of the site soil/rock and the condition of the underlying rock and possible existence of caves or fissures within the rock, determination of stratigraphy, detection of any cavities/sinkholes, and bearing capacity.

SOL Caribbean LTD.- Environmental Site Assessments (ESA)
Phase II Studies of SOL Retail Service Station
November 2015 – January 2016

Consultant Project Manager – Undertook environmental monitoring well installation (6 X 4 inch dia. monitoring wells) for installation of passive remediation product recovery skimmers, and supervision of the installation of two (2) deep injection wells to 100 feet depth for dewatering excavations during underground tank removal, to required discharge capacity to required engineer’s standards – Consulting Engineering Partnership (CEP), as a Sub-Contractor of JADA Builders Inc.

Golder Associates Inc. – Coastal Zone Management Programme (CRMP)
Slope Stability Assessments Scotland District
June 2015 to May 2016

Geotechnical Investigation, Scotland District, Barbados. Installation of Three (3) STP Boreholes & Associated Vibrating Wire Piezometers, and Slope Inclinometers at three locations of the East Coast in Barbados

Golder Associates Inc. – Coastal Zone Management Programme (CRMP)
Sea Cliff Stability Assessments
April 2016

Geotechnical investigation of four (4) drill sites – on the south-east coast, and North coast of the island. Including angular drilling through cliff faces and rock core analysis.

W.F. Baird & Associates Coastal Engineers Ltd./ Golder Associates Inc.
Coastal Zone Management Unit – Waste Water Gaps Assessment
April 2016

Assisting Golder Associates in filling data gaps to complete an evaluation of the mass flux of certain nutrients and biological parameters from groundwater to the marine environment in three specific areas of Barbados. This included drilling, installing, sampling, and testing a number of monitoring wells.

Private Client, Sandy Lane, Barbados
April 2015

Drilling, installation and testing of 200 foot groundwater production wells to specification for irrigation purposes. Included aquifer stress and pump testing, and water quality testing.

Consulting Engineering Partnership (CEP) – Genisis Construction – Installation of Deep Injection Drainage Wells, West Coast Residential Property
April 2011

Project management and supervision of the installation of one (1) injection well, to approx. 150 feet deep on the west coast of Barbados to drain run-off from Highway 1, to relevant engineering standards.

Barbados Light & Power Generation Plant Effluent Waste Water Sampling Programme
January 2011 -2013

Project management and supervision of an ongoing Waste Water Sampling & Laboratory Testing & Monitoring Programme, on waste water effluent from the generation plant cooling towers and site runoff.

Government of Barbados – HMS Dodds Prison – Effluent Waste Water Effluent Sampling Programme
April 2011

Project management and supervision of ongoing monthly, and quarterly waste water sampling and laboratory testing and monitoring of waste water effluent, generated from the facility’s sewerage treatment plant and aeration ponds and settlement lagoons, since 2007 to present.

Stantec Consulting – GAIA inc. / Esso – Airport Aviation Fueling Infrastructure Improvement Project -Geotechnical Study – Borehole Drilling Project
May 2011

Project management and supervision of the drilling of approx. 32 geotechnical testing boreholes, along the alignment of a proposed underground fuelling hydrant line, to be installed along the aircraft parking ramps and runway apron area, in order to characterize substrata conditions.

Stantec Consulting – Barbados Light & Power Co. Ltd. Water Tank Base Borehole INSTALLATION at Generation Plant
May 2011

Project management and supervision of Subsurface drilling of two borehole to 40 feet deep by air rotary method, to be located under the footprint of a proposed water tank located at a generation plant. In addition driller’s log of boreholes were completed indicating any anomalies during this process and down hole video recording of borehole substratum.

 

Rotherly Construction – Sandy Lane Property Installation & Testing of Closed Loop Geothermal Abstraction & Injection Wells/Geotechnical Boreholes
July 2011

Project management and supervision of the installation of two (2) abstraction wells 200-feet deep, and two (2) injection wells 200-feet deep at the above property, including pump testing of water production and discharge capacity to required engineer’s standards (Stantec Consulting).

Completion of a number of geotechnical test boreholes including split spoon STP sampling and NQ rock core samples, preparation of borehole logs, and carrying out percolation testing to relevant engineering standards.

Groundwater & Environmental Services (GES) – Esso Airport Aviation Terminal Monitoring Borehole Drilling and Monitoring Well Installation
October 2011

Project management and supervision of drilling of borehole and installation, of 2 inch monitoring wells to 200 feet depth, at a decommissioned Aviation Fuel Terminal at an international airport. Project included supervision of drilling works, sampling of soil and water and drafting an Environmental Site Assessment (ESA) Phase II report.

Island Developments – Walkers Sand Quarry – Geotechnical Boreholes, and Monitoring Well Installation
November 2011

Project management and supervision of a number of geotechnical boreholes were carried out, and monitoring wells installed to the specification of the project’s professional geologist.
As a follow on study to previous exploration methods carried out by Subsurface in March and August 2009, and Geophysical survey carried out in March 2010 by Subsurface in conjunction with Michael Baker Jr. Inc.

Whereby, a number of standard penetration test (SPT) borings up to 60 to 70 feet through the overlying alluvial sediments were drilled to determine the classification of these sediments, and an electrical resistivity imaging (ERI) performed over the site.